Please ensure Javascript is enabled for purposes of website accessibility

 “Hnetivim Hamehirim” project

Country: Israel

Client: Netivey ayalon

Service: Engineering consulting and management

Year: 2019 - 2022

The fast line project in Gush Dan will be carried out using the PPP – Public Private Partnership method.

The project will provide parking for about ten thousand vehicles, in two parking lots in Rishon Lezion and in Shefayim, and will provide a free transportation system of about 10 lines to major employment centers in the Tel Aviv metropolitan area. In addition, the project will include the operation of an array of highways along Road 2 (Coastal Road) and Road 20 (Ayalon Lanes) from Road 57 to Rishon Lezion – south and north, with a cumulative length of approximately 110 km. In addition, the project will include the construction of Road 541 from the Shefayim Interchange to Raanana, which is about 3 kilometers long.

gallery