Output and Performance-Based Road Contract (OPRC) works contract for Lot 1 (Tororo-Mbale-Soroti-Lira-Kamdini road corridor) and Lot 2 (Soroti – Dokolo – Lira – Kamdini)
Country: Uganda
Client: Uganda National Roads Authority (UNRA)
Service: Engineering consulting and management
Year: 2018/2027
The project consists of a road network in a length of 340 km divided into two lots. The project is funded by the World Bank.