Please ensure Javascript is enabled for purposes of website accessibility

Output and Performance-Based Road Contract (OPRC) works contract for Lot 1 (Tororo-Mbale-Soroti-Lira-Kamdini road corridor) and Lot 2 (Soroti – Dokolo – Lira – Kamdini)

Country: Uganda

Client: Uganda National Roads Authority (UNRA)

Service: Engineering consulting and management

Year: 2018/2027

The project consists of a road network in a length of 340 km divided into two lots. The project is funded by the World Bank.

gallery