Widening and upgrading of the Arava Road 90 in several sections.
Road 90 – km 36-48 – widening of the road to two-lane and two-way routh, arranging two intersections of Ellipse and Samar. Construction of an underground agricultural passage at Samar Junction.
Road 90 – km 18-36, widening of the road to two lanes and two tracks routh, and construction of a new checkpoint at the entrance to Eilat.
Upgrading included the construction of a crash barrier between the tracks in order to prevent frontal accidents and add lighting.