Study for the rehabilitation and improvement of the Tocache – Ponte Porongo highway

Country: Peru

Client: Ministry of Transport - MTC

Service: Integral Road Design

Year: 2008

The study includes the total project of 125 km of highway. The main activities developed were: topographic survey, geometric design, traffic study, soil recognition, quarries and water sources, geological and geotechnical studies, pavement design, hydrology and drainage study, road signage and safety project, social and environmental studies. Structural assessment of the nine bridges along section I, and structural design of the Tocache bridge with a length of 220 m.