Extension of flyover along Trasa Łazienkowska at Agrykola in Warsaw
Country: Poland
Service: Engineering consulting and management
Contractor of the works: SKANSKA
The investment involves the demolition of two flyover, each 392m long and with a roadway width of 10.5m each, and then built new two flyover in accordance with the current higher standards for accessibility and strength of the structures. Traffic on Trasa Łazienkowska will be maintained for the entire duration of the project.
The reconstructed section of Trasa Łazienkowska will feature:
– new roadways
– pedestrian and bicycle paths on both sides
– ramps to improve accessibility of the road for people with reduced mobility