FINAL DESIGN OF THE PROJECT “CA01E ROAD REHABILITATION, SECTION: SIRAMA – DIVERSION TO SANTA ROSA DE LIMA,

Country: El Salvador

Client: Ministry of Public Works and transportation. MOPT

Service: IT, Asset Management, Data collection and Innovation

Year: 2015/2016It is approximately 27.1 km long divided into three sections carried out in stages: Development of the Diagnosis and Evaluation of Existing Works, Preparation of Basic Engineering Studies (Cartography, Topography and Layout of Works, Geology, Geotechnics, Loan Banks, Reservoirs and Quarries, Traffic and Planning and Climatology and Hydrology), Designs (Geometric, Pavement, Structures, Protection Works, Bridges, Minor Drainage, Road Signaling, Cycle Track, and complementary works),

It is approximately 27.1 km long divided into three sections carried out in stages: Development of the Diagnosis and Evaluation of Existing Works, Preparation of Basic Engineering Studies (Cartography, Topography and Layout of Works, Geology, Geotechnics, Loan Banks, Reservoirs and Quarries, Traffic and Planning and Climatology and Hydrology), Designs (Geometric, Pavement, Structures, Protection Works, Bridges, Minor Drainage, Road Signaling, Cycle Track, and complementary works),

gallery