The project expanded two routes with two lanes in each direction, in the eastern section between The Gurel Junction and the Ohalim junction about 18 kilometers long. Two interchanges were carried out in the section: the Negev Brigade Interchange and the Sara Interchange. Negev Brigade Interchange Bridge – approximately 65 meters long. Sara Interchange Bridge is about 63 meters long and the Nahal Bekaa Bridge is about 53 meters long